IP66 outdoor lighting 600W LED SMD round stadium flood light
Technical data:Item name | IP66 600W LED stadium flood light |
Power | 600W |
Light Source | Lumileds 5050 |
LED Qty | 240 pcs |
Input Voltage | AC 85~305V 50/60Hz |
Color Temperature | 2700-6500K |
Light effect | 140~150LM/W |
Lumen | 84,000~90,000LM |
Power Factor | ≥0.95 |
CRI | Ra.≥80 |
Defend grade | IP66 |
Viewing angle | 25° 45° 60° |
Materials | ADC12 die-casting aluminum |
Operating Temp. | -40ºC to +60ºC |
Applications | Stadium,outdoor lighting, Square,Football field,etc. |
Qty / CTN | 1PC |
N.W. | 17.5KG |
G.W. | 19.5KG |
Lamp dimensions | Φ490×330mm |
Carton size | 64 × 51 × 25cm |
Lifetime | 50,000 hours |
Quality warranty | 5 years |
Certificates | CE,ROHS, EMC, LVD, ISO9001 |
Product manual:
1. LED stadium light adopts Lumileds 5050 SMD, energy saving 140~150LM/W high brightness and higher color rendering index > Ra75.
2. Using die-casting aluminum material, the surface is subjected to special oxidation treatment and heat conduction treatment to improve the heat generated by the lamp board and the power source of the lamp, which can be quickly exported to the outside the lamp, lifetime 50,000 hours.
3. MEANWELL brand constant current supply, high efficiency, low heat, high constant current accuracy.
4. Unique structure, high efficiency and energy saving, green and environmental protection.
IP66 600W LED stadium Light Dimensions:
Features:
1. Aluminum material, the light with narrow beam angle can be more focused and goes more far away.
2. Waterproof IP65 for indoor or outdoor use.
3. Optical PC lens, 25 / 45 / 60 beam angles for option.
4. 5050 Lumileds chips, superior efficiency, 140~150 LM/W.
5. Every unit independent heat sink design increase air contact and area, which makes better ventilstion and heat dissipation.
6. 6KV surge protection, wide input voltage AC85-305V, offering superior performance and reliability.
7. Driver cover,protect drivers and make better in heat-dissipation.
Application:
Applicable to Olympic football stadium, stadium, port, airport,dock, large park leisure venues.
Installation instructions:
1. Non-specialist electricians please do not repair or modify this product without authorization;
2. Please turn off the power before installation;
3. Before installation, please check whether the voltage marked on the lamp is consistent with the input voltage to be connected;
4. In order to ensure the service life of the product, please do not use it in a place with strong acid mist;
5. Pay attention to shock protection during installation and transportation;
6. Before installation, ensure that the installation position can withstand 10 times the weight of the product, and install it in a flat place without vibration, no swing, no fire hazard;
7. If the lamp fails, please place the lamp in one place and send it back to the company for inspection and repair.
8. If the lamp body or wire is damaged, please stop using it immediately.
Our workshop:
We have 6 production lines at production department, including assembling, inspection and aging test lines.
Production ability: 8-10 days for 50pcs LED stadium light, and 15-16 working days for 500pcs LED stadium Light at common requirements.
Packing & Aging test :
Each Lamp must pass 24 hours aging test and high voltage surge test before we make packing and make delivery.
Our Services:
1. For all your inquires about us or our products, we will reply you in detail within 24 hours;
2. Excellent design team with designers of more than 12 years experience, can offer professional advice for practical application;
3. 5000,000 pcs light source annual production capacity, the products export to EU market, American market, Russia, Kazakhstan, Australia, South Africa, Zimbabwe, Vietnam, etc;
4. Good OEM & ODM business ability, 6 production lines meet your shipping requirement;
5. Export port Shenzhen, Hongkong or Shanghai;
6. Discount available for bulk order;
7. High quality component and material, Osram, Bridgelux, 3030SMD, 5050SMD, Epistar LED chips, MW / Sosen / HT/ TUV SAA CE listed driver etc, depend on your needs.
Payment Terms:
TT Bank Transfer, support 30% deposit and 70% before delivery;
PayPal, western union, Alipay etc.
NO O/A.
Delivery time:
Samples and less than 100pcs in 3-5 working days;
500pcs in 8-10 working days;
3000pcs in 15-16 working days.
About Shipping:
Samples sent by DHL, TNT, Fed EX, UPS, SF Express, Aramex etc. Door to door, you may pay customs tax depends on your customs policy.
By air or by sea for bulky orders available.
FAQ:
1. Are you factory supplier?
Yes, we are manufacturer of LED lamps since 2008 and we have our own factory, supply duable super quality items and reliable after-sale service.
2. Do you supply OEM or ODM?
Yes, we can supply OEM and ODM serice with favorable price and we have our own mould workshop, your brand and logo can be printed on the items.
3. How long will it spend for our orders to be sent out?
It takes 3-5 days for samples at common requirements, and 10-15 days for big order such as 3000pcs stadium light.
4. What about your after-sales servie and warranty policy?
We offer 5 years warranty for this stadium light, by supplying you the lamp parts or new replacements for free during the warranty period for any non-human defective lamps.